Request for Quote - Industrial Piping Systems

Industrial RFQ
  1. Project name:*
    Entrada no válida
  2. Contact name:*
    Entrada no válida
  3. Contact email:*
    Entrada no válida
  4. Contact phone:*
    Entrada no válida
  5.  
  1. 1. Basic System Information
  2. Media and known chemicals:
    Entrada no válida
  3. System process:
    Entrada no válida
  4. Media temperature:
    Entrada no válida
  5. Ambient temperature range:
    Entrada no válida
  6. Install temperature:
    Entrada no válida
  7. Presión operativa:
    Entrada no válida
  8. Max system pressure:
    Entrada no válida
  9. Flowrate(s):
    Entrada no válida
  10. Size(s) required:
    Entrada no válida
  11. SDR requested (leave blank if unknown):
    Entrada no válida
  12. Presence of solids?
    Entrada no válida
  13. UV exposure?
    Entrada no válida
  14. Buried?
    Entrada no válida
  15.  
  1. 2. Double Containment System Options.
    Please provide information below if system is to be double contained. If single wall, leave blank.
  2. Leak detection options - pressure (check if needed):
    Entrada no válida

  3. Leak detection options - drainage (check if needed):
    Entrada no válida

  4. Leak detection options - manual/probe (check if needed):
    Entrada no válida

  5. Additional components (check if needed):
    Entrada no válida
  6.  
  1. 3. Piping Material Selection.
    If you know what piping material you would like to use, please select it below. If you would like a recommendation from the Asahi/America Engineering Department, please fill out the chemical resistance information.

  2. Single wall pipe (leave blank if unknown):
    Entrada no válida
  3. Other:
    Entrada no válida

  4. Double wall pipe (leave blank if unknown):
    Entrada no válida
  5. Other:
    Entrada no válida

  6. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
    Entrada no válida
  7.  
  1. 4. Chemical Resistance Information.
    Please fill out if a material recommendation is required from the Asahi/America Engineering Department. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
  2. Chemical 1 and Concentration:
    Entrada no válida
  3. Chemical 2 and Concentration:
    Entrada no válida
  4. Chemical 3 and Concentration:
    Entrada no válida
  5. Chemical 4 and Concentration:
    Entrada no válida
  6. Chemical 5 and Concentration:
    Entrada no válida
  7. Temperatura de operación:
    Entrada no válida
  8. Presión operativa:
    Entrada no válida
  9. Max temperature:
    Entrada no válida
  10. Max pressure:
    Entrada no válida
  11. UV Exposure?
    Entrada no válida
  12. Presence of solids?
    Entrada no válida
  13.  
  1. 5. Installation Options
  2. Please indicate any additional service which might be required.
    Entrada no válida

  3. Notas:
    1. Takeoffs cannot be done from process and instrumentation drawings (P&ID's). Site plans will be needed for accurate assessment for leak detection components and routing.
    2. It is the responsibility of the installing contractor to supply their sales contact with a proper material takeoff, as different methods of system layout are used.
    3. Asahi/America cannot and will not be held accountable for incorrect takeoffs and improperly ordered materials. We are here to assist the customer in choosing the correct product for the application.