Request for Quote - Pro-Vent Duct Systems

Provent RFQ
  1. Project name:*
    Entrada no válida
  2. Contact name:*
    Entrada no válida
  3. Contact email:*
    Entrada no válida
  4. Contact phone:*
    Entrada no válida
  5.  
  1. 1. Basic System Information
  2. Media and known chemicals:
    Entrada no válida
  3. System process:
    Entrada no válida
  4. Ambient temperature range:
    Entrada no válida
  5. Install temperature:
    Entrada no válida
  6. Operating static pressure:
    Entrada no válida
  7. Max system static pressure:
    Entrada no válida
  8. Air flow (SCFM):
    Entrada no válida
  9. Size(s) requested:
    Entrada no válida
  10. Possibility of static?
    Entrada no válida
  11. UV expsoure?
    Entrada no válida
  12. Buried?
    Entrada no válida
  13. UL or other code requirement?
    Entrada no válida
  14.  
  1. 2. Piping Material Selection.
    If you know what piping material you would like to use, please select it below. If you would like a recommendation from the Asahi/America Engineering Department, please fill out the chemical resistance information in Section 3.

  2. Vent material (leave blank if unknown):
    Entrada no válida
  3. Other:
    Entrada no válida
  4.  
  1. 3. Chemical Resistance Information.
    Please fill out if a material recommendation is required from the Asahi/America Engineering Department. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
  2. Chemical 1 and Concentration:
    Entrada no válida
  3. Chemical 2 and Concentration:
    Entrada no válida
  4. Chemical 3 and Concentration:
    Entrada no válida
  5. Chemical 4 and Concentration:
    Entrada no válida
  6. Chemical 5 and Concentration:
    Entrada no válida
  7. Temperatura de operación:
    Entrada no válida
  8. Presión operativa:
    Entrada no válida
  9. Max temperature:
    Entrada no válida
  10. Max pressure:
    Entrada no válida
  11. UV exposure?
    Entrada no válida
  12. Pressure of solids?
    Entrada no válida

  13. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
    Entrada no válida
  14.  
  1. 4. Installation Options
  2. Please indicate any additional service which might be required.
    Entrada no válida

  3. Notas:
    1. Take-offs cannot be done from process and instrumentation drawings (P&ID's). Site plans will be needed for accurate assessment for leak detection components and routing.
    2. It is the responsibility of the installing contractor to supply their sales contact with a proper material takeoff, as different methods of system layout are used.
    3. Asahi/America cannot and will not be held accountable for incorrect takeoffs and improperly ordered materials. we are here to assist the customer in choosing the correct product for the application.